, Skip to Main Content
Portfolio

Renewable Natural Gas is our expertise.

2017 WWTP Anaerobic System (City of Fremont, Nebraska)


The project scope includes upgrading the anaerobic and biogas conditioning systems for the City of Fremont. The project scope includes:

Project Details


 
  • Installation of 1500 ft Force main (FM) from the existing industrial site to the anaerobic building.
  • Installation of 3 Lagoons, including Liner system, Cover system, and Weight piping.
  • Installation of an Anaerobic building that includes Concrete foundation, Precast, HVAC & Plumbing, Boilers, Biogas Blowers, Flame Arresters, Pumps, Heat Exchangers, Interconnecting Piping, Electrical & Control Systems, Waste Gas Manhole, and Waste Gas Burner.
  • Installation of new Biogas Conditioning System including H2S Scrubber, H2S Polishers, NaoH Storage Tank, Bioreactor, Membrane Skid, and Glycol Cooling System.
  • Installation of all Underground piping, including Non-Potable Water, Waste Activated Sludge, Biogas, and Natural Gas lines.
  • Demolition and removal of the existing Thickener and Sludge Pump Tanks.

Contact the Experts at Weiss

Start your biogas project right—start with Weiss. From initial design to project closeout, we provide gold standard turnkey service to turn your byproduct gas into a low cost and consistent revenue stream. Through cutting edge technology and an industry leading team, we deliver state of the art RNG scrubbing systems. Bring us your designs, or get in touch today to start project planning.

Contact Us